Application : System I

Step-by-Step Application For New Concrete

After pouring the concrete according to the standards,
             1. The stencil is placed on wet concrete and cut to the length of slab. (See photo)
2. The color hardener (Dry-Shake) is broadcast onto the surface and worked in. (See photo)
3. After concrete has set sufficiently to bear weight, Stencils are removed leaving the pattern    raised in relief with recessed uncolored mortar joints. (See photo)
4. Allow to set and then blow away loose debris. (See photo)
5. Apply Chem-Crete American Flooring Sealer to cure and seal the floor. (See photo)