Application : System I
Step-by-Step Application For New Concrete
| After pouring the concrete according to the standards, | |
| 1. The stencil is placed on wet concrete and cut to the length of slab. (See photo) | |
| 2. The color hardener (Dry-Shake) is broadcast onto the surface and worked in. (See photo) | |
| 3. After concrete has set sufficiently to bear weight, Stencils are removed leaving the pattern raised in relief with recessed uncolored mortar joints. (See photo) | |
| 4. Allow to set and then blow away loose debris. (See photo) | |
| 5. Apply Chem-Crete American Flooring Sealer to cure and seal the floor. (See photo) | |